gypsum plant for producing gypsum powder of building material with new technology
The Crusher will break the big-size gypsum ore into small 25mm pieces, and then the small pieces will be sent to the grinder, after grinding fine, the qualified raw gypsum powder will be sent to boiling furnace to calcine, and the unqualified part will be sent to grinder until it’s qualified. After calcining, the qualified gypsum powder will be sent to spiral conveyor through hoist.
NAME: | Gypsum Plant | CAPACITY: | 30000-500000 Tons Per Year |
---|---|---|---|
TECHNOLOGY: | Advanced Technology | AUTOMATION: | Automatic |
FUEL: | Natural Gas, Coal,heavy Oil |
Gypsum powder production line works based on the following process:
The Crusher will break the big-size gypsum ore into small 25mm pieces, and then the small pieces will be sent to the grinder, after grinding fine, the qualified raw gypsum powder will be sent to boiling furnace to calcine, and the unqualified part will be sent to grinder until it’s qualified. After calcining, the qualified gypsum powder will be sent to spiral conveyor through hoist.
The spiral conveyor will send the calcined gypsum powder to silo for storage, and cool the powder during the process. The dust remover is on the top of silo, the unqualified part will be sent to grinder until it’s qualified.
The stored gypsum will be sent to product storage through steel impeller feeder, spiral conveyor, hoist, and send the qualified gypsum powder to storage or workshop finally.
The top pulse bag-type dust remover will collect dust from crusher, particle silo. When the dust and dust gas get into the dust remover through inlet, the big-size dust particle will fall because the increasing size and decreasing wind speed. The small dust particle will be filtered by filter bag. The filtered gas will be got rid of by outlet.
Production Capacity:
30, 000tons/year —500, 000tons/year
Quality of Final Product:
Conformity with Chinese National Standard GB/T 9776-1988
Raw Materials:
Content of CaSO4 2H2O in gypsum mine >80%.
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum.
Fuel for Production:
Natural Gas, Oil or Coal
The advantages of this calcining system:
Simple structure, free of maintenance
Compact machine, occupy less space
More energy-saving
Gypsum with this system has better physical characteristics and the setting time is easy to control
Better dust collecting result.
Detailed Images
Name: crusher
Function: break big size gypsum rock into small size
Name: Raymond mill
Function: grinding small size gypsum stone into raw gypsum powder
Name: Silo
Function: storage the final products
Name: Layout of the powder line
The basic process of making gypsum powder is: gypsum rock — crusher — raw material silo — grinder — calcinor — silo– packing machine
Packing & Delivery
Packaging
|
|
Size
|
Depending on the capacity
|
Weight
|
Depending on the capacity
|
Packaging Details
|
Suitable package for long distance transportation
wooden boxes: load electrical cabinet, small parts etc. carton boxes: load motor, screw, bolt etc. plastic package: rock wool. |